Fremont, CA · Automotive Manufacturing
Secure Network — Tesla Manufacturing Facility


Buildings
10
Cameras
200
Access Points
100
1. The Operational Challenge
10-building facility required 800 drops, 200 security cameras, and 100 access control points.
2. The Engineered Installation
Installed fiber network, 800 drops, 200 cameras, and 100 access points. Labor involved 1,800 hours.
3. Published Project Results
Improved security protocols and network reliability across the facility.
Core Service Implemented
Commercial Door Access Control Systems
Guaranteed 24-Hour Fixed Pricing · 1-Year Labor Warranty
Have a Similar Commercial Facility Project?
Get a fixed-price proposal engineered for your exact facility. Licensed C-7 Contractor.
AI-assisted estimates use the project details, location, plans, documents, and photos you provide. They are preliminary planning estimates until reviewed and approved by ITECH2.
Licensed Commercial Contractor · BICSI Certified Engineering
Licensed Commercial Contractor · BICSI Standards · (866) 904-8787