Bakersfield, CA · Food Processing & Manufacturing

Food Processing Facility Connectivity — Nestlé

Representative food processing & manufacturing facility for the Nestlé project story
Nestlé logo
Representative facility photo—not the documented project site. Photo: Arseny Khakhalin · CC BY 3.0
Data Drops
300
Cameras
80
Labor Hours
1,200

1. The Operational Challenge

Needed 300 drops, 80 cameras, and WiFi for a secure, high-speed network.

2. The Engineered Installation

Installed fiber network with 300 drops, 80 cameras, and WiFi access points. Labor was 1,200 hours.

3. Published Project Results

Improved network security and production efficiency.

Core Service Implemented
Commercial Fiber Optic Cabling & Fusion Splicing
VIEW SERVICE DETAILS →
Guaranteed 24-Hour Fixed Pricing · 1-Year Labor Warranty

Have a Similar Commercial Facility Project?

Get a fixed-price proposal engineered for your exact facility. Licensed C-7 Contractor.

AI-assisted estimates use the project details, location, plans, documents, and photos you provide. They are preliminary planning estimates until reviewed and approved by ITECH2.

Licensed Commercial Contractor · BICSI Certified Engineering
Licensed Commercial Contractor · BICSI Standards · (866) 904-8787
Food Processing Facility Connectivity — Nestlé | Case Study | ITECH2