Bakersfield, CA · Food Processing & Manufacturing
Food Processing Facility Connectivity — Nestlé


Data Drops
300
Cameras
80
Labor Hours
1,200
1. The Operational Challenge
Needed 300 drops, 80 cameras, and WiFi for a secure, high-speed network.
2. The Engineered Installation
Installed fiber network with 300 drops, 80 cameras, and WiFi access points. Labor was 1,200 hours.
3. Published Project Results
Improved network security and production efficiency.
Core Service Implemented
Commercial Fiber Optic Cabling & Fusion Splicing
Guaranteed 24-Hour Fixed Pricing · 1-Year Labor Warranty
Have a Similar Commercial Facility Project?
Get a fixed-price proposal engineered for your exact facility. Licensed C-7 Contractor.
AI-assisted estimates use the project details, location, plans, documents, and photos you provide. They are preliminary planning estimates until reviewed and approved by ITECH2.
Licensed Commercial Contractor · BICSI Certified Engineering
Licensed Commercial Contractor · BICSI Standards · (866) 904-8787