- Project scope
- Installed fiber network, 800 drops, 200 cameras, and 100 access points. Labor involved 1,800 hours.
- Reported outcome
- Improved security protocols and network reliability across the facility.
- Client
- Tesla
- Location
- Fremont, CA
- Services
- Fiber Network, Security Cameras, Access Control
Project requirements
10-building facility required 800 drops, 200 security cameras, and 100 access control points.
Installation scope
Installed fiber network, 800 drops, 200 cameras, and 100 access points. Labor involved 1,800 hours.
Reported outcome
Improved security protocols and network reliability across the facility.